|
Maharashtra State Roads and Development Corporation
Mumbai, India
Project Description
Lead geotechnical consultant providing oversight for the exploration, in-situ testing,
and foundation design for a 150 m long, simple span, concrete tied arch bridge
consisting of a three span concrete box girder unit. Foundation loads exceeded 150 MN
and a deep foundation system was selected that met all load combinations for a
specified service load design.
|
|