|
Ohio Department of Transportation
Toledo, Ohio
Project Description
Senior geotechnical consultant on the Maumee River Crossing Cable-Stayed Bridge
Project in Toledo, Ohio. Developed and implemented drilled shaft acceptance
criteria during construction. The effort included analyzing cross-hole sonic
logging data to assess drilled shaft integrity. The drilled shafts were 2.5 m
in diameter, fully cased and drilled using oscillator and rotator equipment.
Numerical design support was provided to assess constructability and to evaluate
skin friction, bearing capacity, and expected settlement in fractured rock.
Design support was also provided to assess mitigation designs where defects were
identified in the constructed drilled shafts.
|
|